Intermittent Bonded Ribbon Production Line Available For Sale
A specified speed of 600 m/min gives this equipment considerable production capacity for optical-fiber applications. Before making purchasing plans, buyers should verify the actual speed, configuration, and operating conditions with the manufacturer.
Shanghai Weiye OFC supplies equipment designed specifically for producing rollable ribbons containing 12 or 16 fibers. Its product description presents the equipment’s capabilities, technical specifications, and included systems, providing U.S. buyers with a basis for comparing their equipment requirements.
Review the listed configuration in the product description, then contact the supplier about pricing, installation, and options specific to your project. Doing so can clarify which specifications and options are relevant to your facility and production objectives.
Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. provides its business address as 201 Minyi Road, Songjiang District, Shanghai. Use the product page for initial reference and verify current technical and commercial information directly with the company. A detailed quotation request can help advance your equipment evaluation.
SZ Stranding Line Intermittent Bonded Ribbon SZ Stranding Line
Key Takeaways
- A speed of 600 m/min is listed, but buyers should verify the operating conditions with the manufacturer.
- This equipment supports production of 12-fiber and 16-fiber rollable ribbon formats.
- The product listing describes machine capabilities, technical specifications, and supplied systems.
- Ask the supplier to clarify costs, installation arrangements, and requirements unique to your project.
- A company address in Shanghai’s Songjiang District is included in the supplier information.
Intermittent Bonded Ribbon Production Line Overview
The manufacturer identifies this machinery as suitable for 12- and 16-fiber rollable IBR formats. The published specifications state a 600 m/min construction speed together with a fiber diameter of Ф245 μm ±10 μm. As these are manufacturer-listed values, confirm the actual production speed and relevant operating requirements directly with the supplier.
Intermittent Bonded Ribbon Production Line
Designed To Produce Twelve- And Sixteen-Fiber Rollable Ribbons
Two fiber-count options are supported by the configuration for manufacturing rollable ribbons. This provides a useful reference when buyers compare machinery against their required ribbon format, fiber dimensions, and material-handling arrangements.
How Intermittent Adhesive Bonding Allows Flexible Fiber Configurations
The patent’s design examples describe neighboring fiber subunits joined by adhesive bonds positioned at intervals. The patent provides an example of adhesive-bond intervals ranging between 10 mm and 1,000 mm. Unlike continuous bonding, this arrangement does not join the fibers along their entire length.
By spacing the bonds apart, the assembly can move between a mostly planar arrangement and a rolled, curled, or folded shape. The specified spacing illustrates the patented design concept rather than confirmed production-machine settings.
- Machine details: A choice of 12 or 16 fibers, a listed operating speed of 600 m/min, and a specified diameter of Ф245 μm ±10 μm.
- Patent example: Illustrative spacing between adhesive bonds of 10 mm to 1,000 mm.
- Design benefit: Flexible handling across several possible shapes.
Uses In Optical Fiber Cable Manufacturing
Adjustable fiber layouts may allow cable designers to combine convenient splice access with space-efficient packaging. The patented design keeps fibers arranged in order while permitting sections between bonded points to shift as the cable is assembled.
Compact Cable Designs And High Fiber Density
For mass fusion splicing, an optical fiber ribbon can be arranged flat before being folded or rolled into a more compact cable. The patent identifies opportunities for reduced cable dimensions and a greater proportion of fiber area relative to the cable’s cross-sectional area. The results achieved in practice depend on the complete cable construction and its intended use.
Ribbon Organization For Efficient Fusion Splicing
The ribbon format enables organized handling at the splice location while allowing the subunits to move during cable assembly. For production material planning, the listed specifications include payoff reels accommodating 25.2 km and 50.4 km of fiber. Buyers can evaluate these capacities against their production requirements and existing handling arrangements.
| Design characteristic | Potential use | Consideration for buyers |
|---|---|---|
| Planar fiber arrangement | Mass fusion splicing | Confirm requirements for the splice workflow |
| Folded or rolled format | Space-efficient cable packaging | Review the overall cable construction |
| Payoff reels with capacities of 25.2 km and 50.4 km | Planning material-handling operations | Align reel capacities with operating needs |
Specifications And Performance Of The Production Line
Compare the equipment’s published performance figures with your manufacturing requirements before requesting a quotation. Reel compatibility and facility utility requirements are also important considerations for installation planning.
Speed, Diameter, And Attenuation
The stated construction speed is 600 m/min. The specified fiber diameter is Ф245 μm ±10 μm, while additional attenuation is stated as ≤0.01 dB/km at 1550 nm. Ask the supplier to verify the testing conditions and achievable results.
Compatibility With Payoff And Take-Up Reels
The payoff system accommodates two reel dimensions, and the maximum weight of a full reel is 10 kg. For take-up, the equipment accepts either a T-type reel or a fiber-optic reel. Check whether the preferred reel format suits your existing handling equipment and procedures.
Site Utilities And Environment
Plan for a 380 V ±10% power connection using a three-phase, five-wire system. Its specified operating environment is enclosed, clean, dry, and protected from drafts, with temperatures of 15 to 25°C and relative humidity no higher than 85%. Utility requirements also include nitrogen at 7 bar and 99.99% purity, plus a compressed-air supply at 6 bar. Verify the required utility connections before installation begins.
| Technical specification | Listed requirement | Installation planning note |
|---|---|---|
| Payoff reels | Ф236 × Ф25.4 × 108 mm; Ф267 × Ф25.4 × 180 mm; maximum full-reel weight ≤10 kg | Verify reel dimensions and weight |
| Take-up reel | T-type reel: Φ410 × Φ50.8 × 391 mm, alternatively a fiber-optic reel | Verify the preferred reel format |
| Power and environment | 380 V ±10%; 15 to 25°C; relative humidity ≤85% | Prepare a dry, clean, draft-free operating area |
| Gas supply | Nitrogen at 7 bar and 99.99% purity; compressed air at 6 bar | Verify gas supply capacity before installation |
Fiber Payoff And Gathering Equipment
Optical fibers are guided toward the forming section by the payoff and gathering components. Their control systems support consistent feeding and help protect individual fibers throughout handling.
Tension-Controlled Payoff System For Sixteen Spools
The active payoff accommodates 16 spools, incorporates traversing, and permits independent tension adjustment. Each spool has a maximum weight capacity of 10 kg. Detailed specifications indicate a tension range of 0.4 to 2 N, accuracy of ±0.02 N, and a 550 W motor. Because a separate overview states 40 to 150 g with ±2 g accuracy, ask the manufacturer to clarify the correct values for your intended setup.
Fiber Guidance, Break Detection, And Static Control
U-groove guides, multi-groove gathering rollers, and anti-jump components channel fibers into the forming section. A break-detection system and alarms notify operators when problems occur. Safe handling is supported by protective guards and a pneumatic clamping mechanism. A rod-type electrostatic dust collector is positioned at the fiber exit, and additional anti-static devices help control dust throughout the gathering path.
| Equipment component | Listed detail | Intended function |
|---|---|---|
| Fiber payoff assembly | Capacity for 16 spools, each weighing up to 10 kg | Feeds optical fibers with traversing movement |
| Tension and motor | 0.4 to 2 N with ±0.02 N accuracy; 550 W | Maintains controlled fiber payoff |
| Guidance and safety | Grooved rollers, alarms, guards, and pneumatic clamping | Directs fibers and supports safe handling |
| Electrostatic management | Rod-style electrostatic collector with anti-static devices | Supports dust control along the fiber path |
Precision Molding And Intermittent Adhesive Dispensing
The ribbon-forming platform allows operators to control the mold position and placement of adhesive. Available adjustments help configure the process for each required ribbon format.
Adjustable IBR Mold Platform For Ribbon Formation
Three mold sets are provided for ribbon formation, and each accommodates as many as five Nordson EFD jet valves. Operators can position the mold within 0 to 15 mm and adjust its base temperature from 20°C to 60°C. Grouped precision dispensing valves are installed on slide tables so operators can refine their alignment and place adhesive dots carefully.
Adjustable Nozzle Configurations For Twelve- And Sixteen-Fiber Ribbon Production
For 12-fiber ribbons, the specified arrangement consists of 5+5+1 valves. Production of the 16-fiber format uses a 5+5+5 configuration. The control interface enables changes to dot count and spacing according to the ribbon configuration being manufactured. The process calls for a specialized adhesive suitable for both coating and curing.
| Process setting | Format With 12 Fibers | Format With 16 Fibers |
|---|---|---|
| Dispensing valve layout | 5+5+1 valve configuration | Valve arrangement of 5+5+5 |
| Mold adjustment | Adjustment range of 0 to 15 mm | Adjustment range of 0 to 15 mm |
| Temperature of the mold base | Temperature range of 20°C to 60°C | 20°C to 60°C operating range |
Curing Bonded Fiber Ribbons With UV-LED Technology
The curing assembly applies UV exposure in stages to harden adhesive throughout the fiber structure. Prospective buyers can assess the oven configuration and listed operating specifications to determine whether the equipment suits their production process.
Pre-Curing And Main Curing Stages
Three dedicated LED-UV ovens rated at 800 W each perform the pre-curing operation. Each oven processes fibers supplied by a separate mold group before the material reaches the main 6 kW post-curing oven. The system uses adjustable shutters to help contain UV exposure and minimize nitrogen losses. Published specifications identify a dominant wavelength of 395 nm ±3 nm, a curing degree of at least 85%, and post-curing power of at least 2.5 kW.
Managing Nitrogen Supply And Curing Performance
Operators can manually regulate nitrogen pressure and flow. Automatic functions also start nitrogen delivery during startup and stop it at shutdown. The manufacturer states that lamp-array power use remains at or below 80% of total power during steady, continuous operation at production speed. These specifications provide a reference for comparing equipment, although testing conditions should be verified with the supplier. Discuss how the operating settings may change depending on the adhesive and materials selected.
Visual Monitoring, Capstan, And Take-Up
Visual inspection and consistent winding help preserve fiber quality as material passes through the production line. The published operating settings also offer buyers useful criteria for comparing equipment against their cable production requirements.
Real-Time Inspection Of Fiber Colors And Adhesive Dot Placement
A microscope and camera provide enlarged images in real time. The display allows operators to check the sequence of fiber colors and confirm adhesive resin dots at each dispensing position. By examining the optical fiber ribbon during production, operators can detect potential issues ahead of winding.
Servo-Driven Traction And Precision Take-Up
A 1 kW AC servo motor powers the capstan’s Φ190 mm traction wheel. Metering accuracy is specified as better than 1‰. Operators can set tension between 50 and 500 g while maintaining an accuracy of ±5 g. Together, these settings support controlled movement and handling of the fiber ribbon.
The specified take-up speed is 600 m/min, and the maximum spool weight is 30 kg. Servo-controlled winding and traversing systems help maintain consistent material placement. Cable pitch can be adjusted continuously between 1 and 6 mm. Position detection and direction changes are supported by a photoelectric sensor. Check the intended cable requirements and actual operating conditions with the manufacturer.
Electrical Controls And Production Monitoring
Accessible controls allow operators to adjust settings, check equipment status, and arrange orderly shutdowns. According to the manufacturer, the machinery incorporates Siemens controls alongside Schneider Electric switchgear.
PLC And Touchscreen Operation
The ribbon production line uses Siemens S7-1200 and S7-1500 PLCs with a 10.4-inch Siemens touchscreen interface. Low-voltage switchgear is supplied by Schneider Electric. Operators may control the entire line with interlocked units or run individual sections independently.
Process Settings, Warning Alarms, And Preset-Length Shutdowns
The touchscreen allows adjustment of process parameters, curing-oven activation, wire-feed settings, and alarm information. It also displays lamp operating hours, live lamp current, oven temperature, and the equipment’s accumulated operating time. The meter-counter calibration feature allows displayed counts to be aligned with the distance actually traveled.
A preset length can be entered to initiate slowing or stopping of the machine. The function supports managed stopping as a cable manufacturing run reaches its planned length. Verify the available controls and configuration requirements with the supplier before purchasing.
| Control-system feature | Published specification | Practical function |
|---|---|---|
| PLC and display | Siemens S7-1200/S7-1500; 10.4-inch touchscreen | Adjust and review operating information |
| Electrical control components | Low-voltage switchgear from Schneider Electric | Provides support for system control |
| Monitoring and stopping | Operating data for lamps, ovens, runtime, and meters; preset-length function | Track operating conditions and initiate machine stopping or slowing |
Ribbon Quality, Material Selection, And Process Compatibility
Adhesive selection affects both the consistency of coating application and the final product. Rather than recommending a general adhesive, the supplier specifies a formulation dedicated to the equipment’s coating and curing operations.
Specialized Adhesive Used For Bonding And Curing
Separate valve switches on the pressurized adhesive supply let operators control individual feed paths. Adhesive flow to each dispensing point is managed using precision pressure-control valves. Air pressure can be regulated but must remain at or above the listed minimum of 0.5 MPa.
Black adhesive supply tubing helps protect the material from reactions caused by UV exposure during operation and curing. This protection is important because premature exposure may change adhesive properties before application to the fiber.
Before selecting materials for a secondary coating line, verify adhesive compatibility, production settings, and required surface-quality standards with the supplier. Discuss the material’s expected performance across your planned application and run duration. Clear process instructions can help maintain quality from initial setup through final production.
Installation Requirements And Included Documentation
Ensure the workspace and utility supplies are ready before scheduling the machine’s installation. The supplier’s specifications provide guidance for planning the production site and supporting consistent operation of the fiber-optic machinery.
Facility Conditions And Buyer-Supplied Connections
The machine should be positioned inside a draft-free, enclosed workspace that is clean and dry. Maintain a room temperature of 15 to 25°C and relative humidity no higher than 85%. The installation also requires nitrogen supplied at 7 bar with 99.99% purity and an air supply rated at 6 bar.
Connection cables and cable trays are excluded from the supplied equipment. The purchaser is responsible for supplying the main incoming power cable. Verify the available utilities and planned cable routes ahead of setup, especially if a secondary coating section is nearby.
Operating Manuals, Drawings, And Maintenance Information
The supplier includes documentation supporting machine installation, operation, and servicing. Inspect the supplied documentation before commissioning so personnel can organize tasks and obtain required materials.
- Operating and instruction manuals together with the overall equipment layout drawing
- Wiring and electrical schematic diagrams, plus installation and maintenance drawings
- Purchased-component instructions and a wear-parts list to support service preparation
These documents help maintenance and production teams prepare for initial startup and regular equipment care.
Selecting A Ribbon Production Line That Matches Your Manufacturing Requirements
First determine which finished ribbon products your business plans to offer. The machinery supports 12F and 16F formats and has a stated construction speed of 600 m/min. Assess the stated capabilities against your planned range of products, throughput requirements, and projected cable orders.
Verify take-up reel compatibility before placing an equipment order. A standard IBR reel measures Φ410 × Φ50.8 × 390 × Φ310 mm, accommodates a maximum weight of 30 kg, and allows cable pitch settings between 1 and 6 mm. Check that these specifications suit your production facility and material-handling operations.
The compatibility of payoff spools should be reviewed as well. Available options include international-standard spools accommodating 25.2 km, 50.4 km, and 63 km. Request precise reel measurements before selecting materials or determining production run lengths.
In addition to speed, consider power and gas utilities, suitable adhesives, and the available monitoring functions. For cable manufacturing, determine whether the configuration suits fiber cable, loose tube, or another planned application. Discuss machine configuration and commissioning arrangements with Shanghai Weiye before committing to the purchase. Checking equipment suitability in advance can reduce the likelihood of costly changes after purchase.
| Production planning consideration | Listed detail | Required buyer verification |
|---|---|---|
| Ribbon configurations and operating speed | 12F and 16F formats; 600 m/min | Compare with target production and product mix |
| Take-up | Maximum 30 kg; cable pitch of 1 to 6 mm | Verify that the reel and site arrangements are suitable |
| Payoff spools | Capacities of 25.2 km, 50.4 km, and 63 km | Verify exact spool dimensions |
Request A Quote For The Intermittent Bonded Ribbon Production Line
U.S. buyers can evaluate a system offering 12F and 16F formats, a specified construction rate of 600 m/min, and specialized optical fiber ribbon-forming equipment. Compare these features with your planned cable products to assess equipment suitability.
When requesting a quotation, provide the required ribbon format, expected output volume, preferred reels, and available site utilities. Include information about the fibers and material-handling process to allow Shanghai Weiye to review the intended setup.
Confirm the suitability of the adhesive, the LED wavelength specification of 395 nm ±3 nm, and expected curing results before purchasing. Discuss how the stated specifications affect your intended material and finished surface-quality objectives.
Consult the product page for the published equipment description. Contact Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. to confirm machine configuration, delivery arrangements, and commissioning requirements. The company’s listed address is 201 Minyi Road, Songjiang District, Shanghai. You can call 021-60701630 to review your project needs with the supplier. Providing complete information in your quote request makes the following stages easier to clarify.